Kilgallen & Partners

N24 Beary’s Cross Roundabout Design Backed By Limerick County Councillors

On November 6, 2017
by admin

Kilgallen & Partners’ design for a new roundabout on the N24 at one of the most dangerous and busiest junctions in County Limerick has been backed by Councillors in the Cappamore-Kilmallock municipal district.

They backed the latest stage in the process to construct a €2 million roundabout at Beary’s Cross on the N24. It connects the R513 Limerick to Mitchelstown Road with the Limerick to Tipperary Road.

Tim Fitzgerald, of the Mid-West National Road Design Office and Kilgallen & Partners Consulting Engineers gave local councillors a presentation on submissions received after it went on public consultation. It will be a four leg roundabout, north and south on the N24 with links to Mitchelstown and Murroe-Boher GAA club’s pitch.

Cllr Brigid Teefy said the progress is “very, very welcome”. “We have been waiting so long for this. It is so, so busy,” said Cllr Teefy.

Read the full article at http://www.limerickleader.ie/news/home/280064/roundabout-plan-at-dangerous-limerick-junction-is-being-accelerated.html

Ossory Pedestrian Bridge Opens in Kilkenny

On April 17, 2016
by admin

The Ossory Pedestrian Bridge was officially opened to the public on 23rd of October 2014 by Mayor of Kilkenny Mr. Andrew McGuinness and Chairman of Kilkenny County Council Mr. Pat Millea.

Kilgallen and Partners provided full design services from concept through to completion. The bridge is the longest span timber beam bridge of its kind in Europe. For more details please click on our Bridge section under Civil Projects https://kilgallen.ie/bridge-assessment-repair/.

Image: 3D Model View of Ossory Pedestrian Bridge at Design Stage

Kilgallen & Partners Appointed to Mungret Schools Project (Roadworks) – Jan 2016

On March 16, 2016
by admin

Kilgallen & Partners have been appointed as Employers Representative (ER) for the construction phase of Mungret Schools Project (Roadworks). Works have commenced on site and the project is due for completion by Summer 2016.

Engineering Building Refurbishment (Phase 1) at Queen Mary University of London Complete – March 2016

On March 16, 2016
by admin

Kilgallen & Partners (UK) Ltd. opened their new office in Feb. 2014 in Hammersmith in London. The office continues to grow and has recently completed the structural design of the £7 million Engineering Building Refurbishment (Phase 1) at Queen Mary University of London.

London School of Hygiene and Tropical Medicine – Remedial Works Design – March 2016

On March 16, 2016
by admin

Kilgallen & Partners (UK) have completed the design of a number of remedial structural works projects at London School of Hygiene and Tropical Medicine. These include remedial works to subterranean rooms and balconies that form part of a listed building.

Kilgallen & Partners CPD Audit Review – 8th Dec 2015

On March 16, 2016
by admin

Kilgallen and Partners have successfully completed a mid-point CPD Audit Review with Engineers Ireland. The CPD Review Board commended the company in its report commenting that….

“All the signs are that the organisation has excellent, appropriate CPD systems that are very well integrated with the business and serve it very well”

Kilgallen & Partners Appointed to Portlaoise Southern Circular Route

On March 16, 2016
by admin

Kilgallen & Partners have been appointed to and have commenced detailed design of Portlaoise Southern Circular Route, Abbeyleix Road to Timahoe Road Phase.

« Previous Page

Archive

  • November 2024
  • February 2018
  • November 2017
  • April 2016
  • March 2016
  • Home
  • Profile
  • Client Showcase
  • Services
    • Civil
      • Roads Infrastructure


      • Bridge Assessment & Repair


      • Traffic Management Schemes


      • Traffic & Transport Assessments


      • Surface Water & Sustainable Drainage Systems (SuDS)


      • Water Supply & Waste Water

    • Structural
      • Commercial
      • Industrial
      • Civic Buildings
      • Sport & Leisure
      • Educational
    • Environmental
      • Section 50 Approval


      • Strategic Flood Risk Assessments (SFRA)


      • Stage 3 Flood Risk Assessment (FRA)


      • Flood Alleviation Works


      • Hydrogeology & Ground Water


      • Environmental Impact Statements (EIS)


      • Waste Management


    • Conservation & Restoration

    • Planning
    • Geotechnical
    • Project Management
    • BIM
    • Contract Administration

    • Dispute Resolution
    • Health & Safety
  • Team
  • News
  • Contact

© Copyright 2018 Kilgallen & Partners